7.1 BOM
Select method from Company Information

BOM
Steps of Costing calculation under BOM

Step 1: Setting up the norms table for each product
What are the marterials making the A product?, How much quantity of each material do a product needed to make?).
Each product can use from 1 -> 100 materials (Can be customized if the number of materials is more than 100). Materials can set up according to kg, pcs , metre, bottles ( depending on each type of product )
In this step, when setting up on smart book will create the registration section for norm of each product and create Excel file to import in cases where the company has a lot of the product code .
Check the figure below for details
For example: 1 product needs to use 4 main material and the norm of each type of material is detailed in kg.
FGCode
Material code
Norms/Quota kg
NIBA-07-CT
7W LED PCB
0.570
NIBA-07-CT
LED E27 CAP
0.758
NIBA-07-CT
LED BULB A60 HOUSING 7W
0.852
NIBA-07-CT
LED DRIVER 7W
0.570
Step 2: Summary of finished goods (FG) import to the warehouse during the period
In this step, input the data into the SB on the finished goods import voucher.

Step 3: Summary of work-in- progress (WIP) and convert to finished goods
The software will create a separate section for importing unfinished goods and completion rate and set up the formula to converted from unfinished goods into equivalent finished goods.
Note: A product can have many completion rates. Because, it can be at the beginning, middle or ending stage of manufacturing process.
For example :
Code
Name
WIP qty (a)
Ratio (b)
FG equivalent (c =a*b)
DUOI DEN
Plastic lamp holder (NLH100)
250
65%
162.50
DUOI DEN
Plastic lamp holder (NLH100)
150
80%
120.00
DUOI DEN
Plastic lamp holder (NLH100)
6,816
50%
3,408.00
DUOI DEN
Plastic lamp holder (NLH100)
538
70%
376.60
DUOI DEN
Plastic lamp holder (NLH100)
9,346
35%
3,271.10
After calculating the equivalent products with different unfinished rates, the software will sum up each of product code which converted to the equivalent product. As in the above example, after calculating WIP with different percentages, the total of equivalent FG of this code will be shown as follows:
Code
Name
WIP qty a
Ratio
FG equivalent
DUOI DEN
Plastic lamp holder (NLH100)
17,100.00
7,338.20
Each WIP code is assembled into each line and show the total of final equivalent converted FG, because the result of this step will be used to calculate the value of WIP in Step 9.


Step 4 : Calculate the number of products manufacturing during the period
There is always a logic in the manufacturing as follows :
WIP at the beginning of the period + the product manufacturing during the period -> manufacturing -> FG + WIP at the ending of the period.
Therefore , the formula of the manufacturing process:
WIP at the beginning of the period + the product manufacturing during the period = FG + WIP at the ending of the period.
Then, knowing the 3 factors of this equation will calculate the remaining factors. And here, 3 values are always defined as:
1. Quantity of WIP at the beginning the period (from the previous the period forward),
2. FG manufactured during the period and
3. WIP at the end of the period (provided by the customer's inventory)
🡺 Products manufactured during the period = FG + WIP at the ending of the period – WIP at the beginning of the period
On the SB will be setup to calculate the amount of manufactured products

Step 5: Calculate the amount of material according to the BOM for the number of manufactured products
At this step, SB will setup the formula to calculate the number of material according to norms (already set up in Step 1) for the products manufacturing during the period ( already calculated in Step 4)
FGCode
RMCode
Norms kg (a)
Qty products (b)
Material used by BOM (c)=(a)*(b)
NIBA-07-CT
7W LED PCB
0.570
58,315
33.230
NIBA-07-CT
LED E27 CAP
0.758
58,315
44.225
NIBA-07-CT
LED BULB A60 HOUSING 7W
0.852
58,315
49,697
NIBA-07-CT
LED DRIVER 7W
0.570
58,315
33.230
NIBA-07-WT
7W LED PCB
1,000 yen
26,366
26,366
NIBA-07-WT
LED E27 CAP
1,000 yen
26,366
26,366
NIBA-07-WT
LED BULB A60 HOUSING 7W
1,000 yen
26,366
26,366
NIBA-07-WT
LED DRIVER 7W
1,000 yen
26,366
26,366
Note: A product will use many materials for manufacturing so the formula will set up to fully calculate all the materials codes which are used to manufacture a finished goods code.
Step 6: Summary of output materials in practice by product code
This step is quite similar to the step of setting up materials for each specific product code, because this data is the actual output materials of customer.
SB should have an import form because with many finished goods, it will not be possible to input manually.
RMCode
Output material in practice
7W LED PCB
34,918.19
LED E27 CAP
45,909.50
LED BULB A60 HOUSING 7W
51,385.13
Step 7: Compare the difference between the output materials in actual and the norm of materials
After obtaining the quantity of output material in actual and output warehouse according to the norm. This step needs to determine the difference in the quantity of materials between the actual and norm.
In fact, there is always a difference between the actual quantity of output material and the material built on the norm.
Case 1: output material in actual > material according to the norm.
In terms of accounting regulations: in case the output materials in actual > the output materials according to BOM. The difference will be recorded in the cost of goods sold
For example: Actual output materials is 100, norm is 75. The difference of 25 will be recorded directly in cost of goods sold (Account No. 632)
The accouting entry on SB when output materials for this case as follows:
1 / The output materials according to norms:
Debit 621 / Credit 152: 100
2 / Materials that SB calculate according to BOM: 75
3 / Transfer material to calculate the costing
Debit 154: 75
Debit 632: 25
Credit 621: 100
Case 2: Output material in actual < the norms
In addition, in case of the output material in actual is smaller than the material norm, in this case the accountant can go back to step 1 to adjust the material norm for each product.
Therefore, SB needs to set up 2 formulas to handle these 2 cases. Because there will be output material > material norm and output material < material norm in some material codes.
ðŸ¡ºï€ Check the excel file for details

Step 8: Determine the number of materials to calculate the costing
After completing step 7, the amount of materials to calculate cost of goods manufactured will be the actual or norm materials depending on each materials code.
Step 9 : Calculate cost for each product
This step will allocate the labor cost and overheads cost to each product according to the cost of material. The labor cost and overheads cost are collected and uploaded in the costing section as the table below:

Note: the formula to calculate unit cost for each product code ( final column_unit cost )
When calculating the unit cost for 1 product, it will average for the whole WIP at the beginning of the period.
The reason: the WIP at the beginning of the period is still manufacture this the period. Averaging will make the unit cost of the product less fluctuated.
When setting up on SB, the IT team should note this formula.
Step 10: Calculate the value of WIP at the ending of the period

The value of WIP at the ending of the period is calculated according to the formula:
The equivalent FG * unit cost
The equivalent FG are determined at step 3, the unit cost is determined at step 9
Step 11: Determine the value of FG input during the period

At this step, the manufacturing equilibrium equation is used to determine the value of finished goods input warehouse during the period .
The value of FG input during the period = Value of WIP at the beginning of the period + incurred manufacturing costs during the period - Value WIP at the ending of the period
After calculating the value of input warehouse product-> determining the unit cost of products = total value of input product / total quantity of input finished products (determined at step 2)