# 7.5 Phased

## &#x20;PHASED:

&#x20;   **Setup costing by CostCenter, by Phased and by Group Product**

### Step 1: Create Costcenter and setup allocate expense.

From Main Menu choose General Setting Information, CostID:

<figure><img src="/files/b0BHp9ecV4BtFGWtTJDF" alt=""><figcaption></figcaption></figure>

<figure><img src="https://lh7-us.googleusercontent.com/LRufEbNPwlNOdCLzTw69CylEb5XkmkG9wpFsaNGiPzmP4BwECKTzNnM_BLYO1YpfQx4-AVC2LQW8xpFKt6DIm4j3uQkyiSHaeXza0BoMTRrlQtPR1pmbc_If2nPSbLRojx9WxlDJwClwkEV-imAlY_PqBU71d9Ho" alt=""><figcaption></figcaption></figure>

CostCenter ID

CostCenter Name

Cost Group: 621 : Raw material, 622: Labour cost and 627: Overhead cost.&#x20;

Setup allocate expense:&#x20;

* PhaseID:  set up expense for each phase. Phased should be 1,2,3,etc… or All (All of phase)
* CostMethodID: is method allocate expense for each group product, product&#x20;
* Option 1 : allocate direct material&#x20;
* Option 2 : allocate by rate
* Option 3 : allocate by customize

### Step 2: Setup rate allocate expense for each phase.

Firstly, expense after summary in period will be allocated for each phased.

AllocationPhaseID: Default is option 1 (use for all CostCenterID)

PhaseID: phase No.

Rate: rate for each PhaseID

FromDate -ToDate: Time to apply

<figure><img src="/files/tHCDVBUc3pBIgFwEVYcL" alt=""><figcaption></figcaption></figure>

<figure><img src="https://lh7-us.googleusercontent.com/qvwgHB4R3k7XhCSpvF9gXon58OsDk0FYauqHnMxolbfBEQDv5JIhVFZYLFzFgQ8ly4Rhk3qXhDLHLYZMf7hiCVyKJNDqKMXXnkxW6T336ox4iX3-YDg3APxi_mjrva-atuI1z0VY5w6oAfxkydN1YpVtcsKn6U7s" alt=""><figcaption></figcaption></figure>

### Step 3: Setup rate for each Group Product

Applied when allocate expense by quantity multiplication rate (CostMethodID = 2, AllocationMethodID = 1).&#x20;

Firstly, expense after summary will be allocate for each phase, second will be allocate for each group.

* Setup:

GroupID:&#x20;

Rate: If evenly distributed by quantity should be choose 1 for all GroupID

PhaseID

FromDate -ToDate: Time to apply

<figure><img src="/files/H10I6b3kRuOOzrpxMuKE" alt=""><figcaption></figcaption></figure>

<figure><img src="https://lh7-us.googleusercontent.com/a439KYfBqYUz5RzpBFQuYGH6qaLofWViZ2hJmEiwwV3J1M_KDf3OnTSuTmNgd8O1p_E55N98ZTppCY7_vCTr3LO7yWUIQZgoP7prsdnQK395rLdLBb8B-XB6KTqzkqAun6OLivR2H3kL2YVs99ERxn96IU8Wk8UV" alt=""><figcaption></figcaption></figure>

### Step 4: Setup rate for each product

Applied when allocate expense by quantity multiplication rate (CostMethodID = 2, AllocationMethodID = 1). Firstly, expense after summary will be allocate for each phase, second will be allocate for each group, third will be allocate for each product

Setup:

ProductID &#x20;

Rate: rate by Coefficient, Selling price or Simple method.

PhaseID

FromDate -ToDate: Time to apply

<figure><img src="/files/sorjMSQDKaLApOwn5JYa" alt=""><figcaption></figcaption></figure>


---

# Agent Instructions: Querying This Documentation

If you need additional information that is not directly available in this page, you can query the documentation dynamically by asking a question.

Perform an HTTP GET request on the current page URL with the `ask` query parameter:

```
GET https://local.docs.ssaudit.com/english-1/inventory-management-module-1/7.5-phased.md?ask=<question>
```

The question should be specific, self-contained, and written in natural language.
The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.